Grassroots Party Building

[News] Representatives of w88 casino’s Teachers’ Congress inspected the gymnasium construction project


Release time: 2014-06-30 17:06 Number of views: 6159_6218 times Editor: Cui Hao Chen Huan

w88 casino News Network (provided by the w88 casino union)In order to allow representatives of the Teachers’ Congress and the majority of faculty and staff to keep abreast of the development and construction of various undertakings in the w88 casino,6month26On the afternoon of 6653_6706|, the w88 casino w88 union organized a group of more than ten people, including representatives from the Teachers’ Congress, chairman of the branch w88 union, and teachers from the Physical Education Department, to conduct an on-site inspection of the comprehensive gymnasium project under construction in the w88 casino.

Ren Minghe, Director of the Infrastructure Department, introduced the construction status of the comprehensive stadium to the delegates. The total construction area of w88 casino’s comprehensive gymnasium17165㎡, four floors above ground, two floors underground, the highest point of the building26.1M. There are facilities on the ground floor of the gymnasium50meter standard swimming pool, the civil air defense layer is usually used as a room for college students' activities and multimedia teaching; the ground is a comprehensive hall integrating basketball, volleyball, badminton, table tennis, etc., with fixed seats in the stands1873个,活动座位888, the comprehensive hall can also be accommodated4000It is a public hall and can be used as a large-scale performance venue for students. Ren Minghe said that the construction of the comprehensive gymnasium will provide good hardware facilities for the w88 casino's physical education and meet the w88 casino's needs for large-scale conferences and performance venues. Tang Yun, project manager of Zhongcheng Construction Fifth Engineering Bureau Co., Ltd., the construction company of the stadium, welcomed the arrival of the representatives. He said that all employees of the company will strictly control the project quality and construction safety, and complete the project construction with quality and quantity.

The representatives put on safety helmets and entered the construction site under the guidance of the project manager. The representatives saw that the overall structure of the gymnasium had been formed. The appearance looked like a gold ingot, with stairs at the four corners leading to the main stadium on the second floor. The overall feeling was grand, graceful and elegant. The representatives walked along the stairs to the interior of the stadium, where construction workers were braving the sweltering heat and were working intensively. Now they are mainly carrying out interior decoration work and will be put into use in the near future. While visiting, the representatives consulted Director Ren Minghe on issues they were concerned about, and Ren Minghe answered them one by one. Many representatives raised their mobile phones to take pictures of this young building in order to share it with more teachers.

Stadium renderings

Through this inspection, the representatives have a deeper understanding of the comprehensive gymnasium of w88 casino and are full of expectations. Everyone hopes that it will be successfully completed and serve the teachers and students of w88 casino as soon as possible.



 
Sponsored by the Propaganda Department of the Party Committee of the w88 casino
Copyright © 2011 UIBE All rights reserved.
w88 casino All Rights Reserved
w88 casino address: No. 10, Huixin East Street, Chaoyang District, Beijing Postal Code: 100029