Latest news

[Achievements] Strengthen infrastructure construction and create a conservation-oriented campus


Published: March 29, 2010 00:00 Number of views: 4772_4831 times Editor: Xiaofeng

Strengthen infrastructure construction Create a conservation-oriented campus

w88 casino News Network (Reporter Nerobar Alti)Since the 10th Party Congress of w88 casino, under the leadership of the w88 casino party committee, the Infrastructure Department has achieved fruitful results in campus infrastructure construction, energy-saving campus construction, and campus environment improvement. On the occasion of the 11th Party Congress, Secretary Wang Ling made a mobilization report, summarizing the work of the w88 casino party committee in the past five years, and decided to hold this year’s party congress to plan the blueprint for the w88 casino’s next development, determine the direction, and clarify the goals.

Ren Minghe, Director of the Infrastructure Department, accepted an interview with reporters. He said: "The convening of the 11th Party Congress is an exciting thing for the w88 casino, because if the w88 casino wants to develop, it must have a clear direction to create a first-class university. Now the w88 casino is in the best stage of development, and I believe that it will be better under the influence of the Party Congress. Our discipline construction, talent training, and social services will also reach a new level.

Director Ren Minghe summarized the work done by the Infrastructure Department since the 10th Party Congress and the future work plan.

w88 casino infrastructure construction is further improved

In terms of dormitories, the boiled water supply to the dormitories, the access control system, and the newly completed first and second phases of the Hongyuan Building solar energy project have made the student dormitory services more convenient and have been well received by everyone. This year, the Infrastructure Department needs to complete the replacement of smart meters, energy-saving lamps, and sensor switches in public areas in Hongyuan Building, Building 0 to Building 6.

In terms of the canteen, the second phase of renovation of the canteen, the renovation of the Muslim restaurant and the renovation of the audio-visual center should be launched to provide students with a better place for activities.

Building a conservation-oriented campus

In terms of water resources conservation, the construction of the first phase of the final water treatment station has been completed. The final water treatment station can process one thousand tons of sewage per day. The second phase under construction is the old student dormitories and old buildings. Smart cards have been used for bathing water, which has improved students' awareness of water conservation and achieved certain results. In response to the problem of insufficient water sources, we will use rainwater collection methods to build a third-phase rainwater collection project, and the collected rainwater will be treated in the third-phase final water for use.

In terms of electrical energy-saving transformation, the first is the completion of solar street lights, which saves a lot of electricity. To solve the problem of insufficient power in the shaded areas, wind power generation is planned to be used to compensate.

The second is voltage reduction. We know that the current common voltage is220V, and the real lighting electricity only requires180V, so the pressure reduction and power saving effect is very impressive. For this reason, we need to replace transformers, voltage cabinets, and high-voltage cabinets from time to time to meet the requirements of electrical energy conservation.

The third is the bathing water heat collection project. The excess heat after heating the bathing water is collected and used in other aspects to achieve energy saving purposes.

The campus environment is more comfortable

The completed construction of the south gate and west gate of the w88 casino has improved the overall appearance of the w88 casino, and the renovation of the roller skating venue has provided a good place for student activities.

This year, a scientific research building will be built at the location of the University Student Activity Center. The bidding is now basically completed. What needs to be done in the near future is to remove the high-voltage cables and heating pipes from the underground foundation of the scientific research building.

There is also the renovation project of the south wall. The area from the new library to the south gate of the w88 casino will be laid out, construction houses will be demolished, and greening will be carried out. Provide students with a comfortable place to study, rest, and make friends.

The reporter then interviewed a sophomore student and asked about the impact of the improvement of the campus environment on her. She said: "The boiling of water in the dormitory has provided us with great convenience. Borrowing books from the new library has also become much more convenient. The already good campus environment is getting better and better."





 
Sponsored by the Propaganda Department of the Party Committee of the w88 casino Technical support from the Network and Educational Technology Center
Copyright © 2005-2009 UIBE All rights reserved.
w88 casino All Rights Reserved
w88 casino address: No. 10, Huixin East Street, Chaoyang District, Beijing Postal code: 100029