w88 casino News7month19President Chen Zhunmin inspected Ningyuan Building accompanied by heads of the Infrastructure Department and other relevant departments(New teaching building), Hongyuan Building(New Student Apartment), student temporary dormitory building, reclaimed water treatment project, garage renovation and second student canteen renovation and other infrastructure construction sites.In order not to affect teaching and scientific research, the w88 casino's infrastructure and maintenance department regards summer vacation as the golden season for construction every year, especially this year.
The construction area of Ningyuan Building is3Ten thousand square meters, it is now in the final stage. Office desks, chairs, desks and chairs have been ordered, and outdoor pipeline and greening projects are also being carried out. It is estimated to be8month15It will be fully completed within days.
The construction area of Hongyuan Building is910,000 square meters, can accommodate nearly 1,000 students1Ten thousand people, its completion will greatly improve the accommodation conditions for w88 casino students. Due to the large amount of work, it is planned to be11Completed in January. Since there is a two-month time gap between the arrival of new students, the w88 casino is building six temporary dormitories in the financial playground to accommodate some200510705_10715
In order to build a water-saving campus, the w88 casino has recently built three gray water treatment tanks on the north side of Ningyuan Building, the west side of Huizhi Building and the south end of the financial playground to collect rainwater and domestic water for office buildings and dormitory buildings. After the water is treated and purified according to national standards, it will be used for garden irrigation, toilet flushing, road cleaning, and supplementary water for cooling equipment.
The garage will be transformed into a computer language room, which can be equipped with computers200Multiple units; After the renovation of the second canteen, the usable area will be expanded and the dining environment will be improved.
Everywhere he went, Principal Chen listened carefully to the reports, carefully inspected the work, and expressed his sincere condolences and heartfelt thanks to all the staff who braved the sauna-like heat to work on the construction site.
Principal Chen pointed out that the capital construction projects under construction and about to be started in the w88 casino are major measures for w88 casino to improve teaching and research, as well as the work, study and living conditions of teachers and students, and have an important impact on the w88 casino's achievement of the grand goal of leap-forward development; therefore, all relevant departments must continue their efforts, overcome all difficulties, and complete various tasks on time and with quality.