w88 casino News Network (Correspondent Chang Wenlei Photography Chang Wenlei) 2013Year9month17On the morning of the same day, w88 casino "211Project” construction on-campus kick-off meeting in the administrative building222Conference room held. Principal Shi Jianjun and other w88 casino leaders,The deans (directors) of each college (department), heads of the Scientific Research Office, Academic Affairs Office, Human Resources Office, Finance Office, Audit Office and other relevant functional departments, as well as all staff of the subject office attended the meeting.

Vice President Lin Guijun presided over the meeting. He looked back at the w88 casino "211Project” construction process, introduced this time“211Engineering”Progress of on-campus launch. Lin Guijun pointed out that in167943_7956211Project" construction has achieved great results and greatly improved the level of w88 casino discipline construction. The new historical period has put forward higher requirements. It is necessary to highlight the construction of disciplinary infrastructure, and at the same time, we must also do a good job in building think tanks that serve national strategies. Each discipline should carry out construction in a targeted manner according to its own positioning; the w88 casino is in "211Establishing academic departments and platforms under the framework of the "8108_8160|Project" construction project is conducive to strengthening collaborative innovation in discipline construction; think tank construction must have clear goals and appropriate methods.
Principal Shi JianjunPoint out that in "211In the construction of "Project", special attention should be paid to three aspects: First, we must distinguish between "211The difference between "Engineering" construction projects and general scientific research projects. Second, we must properly handle the relationship between personal development and team building. Third, we must establish the college in "211Project” as the main body of construction.Principal Shi Jianjun believes that “2119007_9046211Project" construction puts forward six requirements: First, it must be in "2119118_93382119365_9419It is necessary to clarify the responsibility system and ensure that the responsibility is assigned to everyone,Ensure that the construction tasks achieve the expected goals.
Principal Shi Jianjun said, "211Project" construction is a national project, which has played a major role in promoting the discipline construction of colleges and universities in my country. The overall goal of launching the construction project on campus is to lay a solid foundation for the construction of a high-level and distinctive university, and to carry out discipline construction for the construction of a world-class discipline. Each college must attach great importance to it, organize carefully, brainstorm, and strive to produce more distinctive, iconic and characteristic achievements that embody the "w88 casino w88 casino".
Director Qiu Hongwei of the Discipline Construction Office introduced“211Project”Revision of the campus construction plan and follow-up work content. Participants gathered around "211Project" consultation and discussion on the campus start-up construction plan.