w88 casino News Network (provided by the Logistics and Infrastructure Department)In order to thoroughly implement the spirit of the w88 casino’s 13th Party Congress and accelerate the iterative upgrade of campus sports infrastructure, the w88 casino will start the construction of the track and field renovation project in 2025. With the strong support of the leadership of the w88 casino’s party committee and alumni, all departments worked together to overcome many difficulties such as the early closure of the stadium, frequent rains during the summer, policy shutdowns, and construction schedule adjustments. After four months of hard work day and night, the construction was finally completed in early September and officially opened to teachers and students in the new semester.


The w88 casino's track and field field was renovated in 2012. After 13 years of ups and downs, it has undertaken various large-scale activities, sports events, and daily teaching and training for teachers and students in the w88 casino. The plastic track and artificial turf have shown serious wear and tear. The plastic track is degummed in many places and has weakened elasticity; the artificial turf grass fibers are sparse and particles are exposed; and the surrounding mesh is severely corroded. Not only does the track and field before renovation pose certain safety risks, it is also difficult to meet the needs of teachers and students for daily exercise, physical education, extracurricular training, and intramural competitions, and is in urgent need of upgrading.
Comparison before and after transformation:

In order to improve the conditions of sports venues, the Logistics and Infrastructure Department, together with the Ministry of Sports, took the lead in setting up a special work team. Adhering to the needs of teachers and students as the center, they investigated more than 10 university venues and social professional venues to benchmark FIFA QUALITY PRO and China Athletics Association certification standards, combined with w88 casino's actual use intensity and teaching and training needs, repeatedly demonstrated functional zoning, material selection and cost control, and finally formed an integrated design plan of "international standards, w88 casino characteristics, economical and efficient" to ensure that every investment is transformed into safety and experience for teachers and students.
The renovation of the track and field field covers 8980 square meters of track, 7960 square meters of football field and 3900 square meters of fence. The entire venue uses the professional sports ground system of the internationally renowned brand Polytan. The plastic track adopts an on-site paved 14mm thick composite granular surface layer with an impact absorption rate of ≥40%, which perfectly balances speed and shock absorption needs. The football field uses high-density people certified by FIFA. The grass-making system has a grass fiber density of 18,900 stitches/square meter and is filled with EPDM rubber particles and children's playground-grade environmentally friendly sand, which has good buffering and impact resistance. The fence uses ND76 welded steel pipes, a hot-dip galvanized protective layer and pure polyester powder spraying treatment. The structure is stable, beautiful and durable.
The renovated track and field will be presented to teachers and students with high standards of quality. It has excellent buffering and rebound effects, which can effectively protect the joints of athletes and reduce sports injuries. At the same time, it can meet relevant domestic and international certification standards. The artificial turf's football ground rolling resistance, ball rebound rate, drainage rate and other indicators all meet FIFA requirements. It has obtained FIFA QUALITY PRO certification on August 1, 2025, and has the conditions to hold football matches of different levels. The thickness, vertical deformation, and impact absorption rate of the plastic track all meet the specification requirements, and basically meet the requirements of the Chinese Athletics Association's second-level venue certification and the World Athletics Federation's second-level venue certification requirements. Certification applications have been submitted to relevant organizations.

As an important livelihood project of the w88 casino to "do practical things for teachers and students" in 2025, the renovation of the track and field field was completed and put into use as scheduled, which fully reflects the w88 casino's high emphasis on the health of teachers and students and the high-quality development of physical education. The comprehensively renewed campus sports space builds a safer, more professional and more comfortable educational environment, and gathers vigorous sports forces for the w88 casino's "double first-class" construction.(Reviewer: Wang Zurui)