w88 casino News Network (Reporter Li Yuxuan Photography Yujun)2016Year3month22On the morning of 6852_6880|, the groundbreaking ceremony for the teaching complex building of w88 casino was held at the original site of Qiusuo Building.
Wang Ling, Secretary of the Party Committee of w88 casino, Shi Jianjun, the Principal, Chen Jianxiang and Wenjun, Deputy Secretaries of the Party Committee, Zhang Xinmin, Zhao Zhongxiu, and Yang Changchun, Vice Principals, and Wang Qiang, Assistant to the Principal, attended. Hu Meixing, deputy secretary of the party committee of the construction party Beijing Housing Group Co., Ltd., deputy general manager Wu Xiaojie, Lei Hongyu, secretary of the party committee of the general contracting department, Zhu Xiaowei, general manager of the general contracting department, and Zhang Xuesong, general manager of the supervisory party Beijing Huaxia Engineering Project Management Co., Ltd. attended. The heads of relevant functional departments of w88 casino, project bidding agents, representatives of tracking and auditing units, managers and workers’ representatives of the project departments of construction units and supervision units attended the ceremony.
Ceremony site
Principal Shi Jianjun delivered a speech,The teaching complex building project is a project of w88 casino's "Twelfth Five-Year Plan". It is a comprehensive educational facility that demolished the original Qiusuo Building and the University Student Activity Center and rebuilt and expanded it on the original site. The teaching complex is planned and designed in accordance with the concepts of "applicable, economical, green, and safe". It is a strategic decision that benefits the entire w88 casino's teachers and students and is related to long-term development. It is also a practical action by the superior department and the w88 casino to attach importance to education, pay attention to teachers and students, and ensure teaching. It marks another solid step that w88 casino has taken on the road of sustainable development. The teaching complex will be completed in the early stage of the "Thirteenth Five-Year Plan". Its operation will further expand the w88 casino space of w88 casino, greatly improve the structural shortage of educational and teaching buildings in the w88 casino, provide multi-functional and modern facilities for the w88 casino's teaching, scientific research and innovative talent cultivation, and provide a solid hardware foundation for the w88 casino to continue to consolidate its leading position among similar universities and gradually build into an internationally renowned and distinctive first-class university.
Speech by Principal Shi Jianjun
Principal Shi Jianjun said that the teaching complex was built on the original site of the Qiusuo Building. The old Qiusuo Building once nurtured the ideas of running the University of w88 and Economics and the Ivy League dream. Generations of outstanding students from the University of w88 and Economics have come out, and have witnessed the flourishing development of the University of w88 and Economics. The renovated and expanded teaching complex will be a "grown-up" Qiusuo Building. It will carry the dreams of the University of w88 and Economics with a more generous mind and welcome the return of the students of the University of w88 and Economics. It is hoped that all departments of the w88 casino will actively cooperate, strengthen communication, and guide teachers and students to support the construction of the project from the perspective of the overall sustainable development of the w88 casino; hope that the construction unit will overcome the difficulties of the small construction site and being close to the teaching building and library, and try to reduce the impact of construction on normal campus activities. They will assume their respective responsibilities, closely cooperate with the design, supervision and other participating units, carefully organize and carry out safe construction, and build the teaching complex into a first-class safety project, a reliable project, a clean project, and a high-quality project to ensure that the project is completed on schedule with high quality.
Wu Xiaojie, deputy general manager of the construction general contracting unit, and Zhang Xuesong, general manager of the supervision unit, delivered speeches
Wu Xiaojie, deputy general manager of Beijing Housing Group Co., Ltd., the construction unit, said in his speech that a management team that has participated in the construction of the Luban Prize project will be selected to formulate a scientific construction organization plan. Under the unified command of the construction unit and with the strong support and supervision of the supervision unit, efforts will be made to build the teaching complex building project into a green project, a safety project, a sunshine project, and a quality project with excellent quality, reliable functions, and satisfaction for the w88 casino, teachers and students.
Zhang Xuesong, general manager of Beijing Huaxia Engineering Project Management Co., Ltd., said in his speech that he will use expert resources inside and outside the company to conscientiously perform the supervision responsibilities of "three controls, two managements, and one coordination", focus on guiding and inspecting key and difficult parts of the project, and provide professional and technical support and guarantee to achieve efficient, clean and high-quality operation of project supervision.

Finally, the leaders and guests laid the foundation stone for the teaching complex building.
It is reported that after reconstructionTotal construction area of the teaching complex46995㎡, total building height44.7meters, including: eleven floors above ground and eight floors in the east and west annex buildings, with a construction area of approximately31950㎡. Three floors underground, construction area approximately15050㎡. The main functional buildings include: large, medium and small classrooms (two to eight floors underground); teaching service rooms (above nine floors, conference area and office space); college student activity center (large lecture hall on the first floor of the annex building); civil air defense and garage (three underground floorsDesign parking space100more than one); equipment rooms, etc. Project planned duration2Year, after completion, the w88 casino will have a net increase in building area36655㎡, effectively alleviating the structural contradictions of teaching, scientific research, and student activity rooms.
