w88 casino News Network (Infrastructure Department Draft)The library and information center project of w88 casino has been completed after more than two years of hard work by the construction unit with the careful organization of the Infrastructure Department and the active cooperation of the relevant departments of the w88 casino. It has basically reached the conditions for use and is now being delivered for use. The w88 casino has decided that Beijing Shouhua Property Co., Ltd. will take over the daily operation and management work. In order to let all the teachers and students of the w88 casino have an understanding of the new library, here is a brief introduction to its architectural layout, usage functions, etc.
1. Basic overview and architectural layout
The building area of the library information center is24935.54square meters. There is one underground floor and eight floors above ground. The total height of the building is31.86meter, collection of books200Ten thousand copies available12000human use. As the landmark building of w88 casino, the Library Information Center integrates lending, reading, collection, academic exchanges, and office work. During the construction process, the principles of: practical, economical, beautiful, and advanced were always adhered to. In terms of layout, more attention was paid to the all-round, open, high-efficiency, and high-quality characteristics of modern libraries. The management method has changed from the traditional, single, manual closed type to the method in which books and materials meet directly with readers and are mainly borrowed from open shelves. The traffic and vertical traffic layout of the new library is completed by four main stairs and three elevators.
The underground floor is a dense library, equipment room and underground garage that are also used for civil defense; the above-ground floor is the library hall, equipped with a borrowing desk, electronic retrieval hall, Chinese periodical current issue reading room, VIP reception room, etc. On the background wall of the borrowing desk are engraved32The country’s word “book” has brick carvings and hanging boards in the Chinese and foreign journal reading room. On the north side of the retrieval hall, there is a staircase leading to the second-floor lecture hall with 1,000 people. This public area is also the link between the hall and the Chinese and foreign reading room. In the functional boundary area, a water curtain wall landscape is set up here to provide readers with indoor leisure places; the second to sixth floors are various reading rooms and research rooms; the seventh floor is the customs special collection room and seminar room; the eighth floor is the electronic reading room, data processing room and audio-visual room.
二 , various functions in the building
1、Water source heat pump system
The Book Information Center uses water source heat pump technology as the building's heat and cold source to achieve cooling in summer and heating in winter. The comfortable reading environment makes readers here feel happy.
2、Firefighting system
A fire alarm and linkage system is installed in the library. Once a fire occurs, the fire detector can quickly transmit the fire alarm signal to the fire control room. The alarm controller will send out an alarm signal after analysis and processing. At the same time, the corresponding fire linkage facilities will be activated. If necessary, the fire broadcast on the fire floor and adjacent upper and lower floors will be connected to organize the evacuation of personnel in time and put out the fire. Achieve the purpose of preventing fire and reducing fire losses.
3, security system
There is a security monitoring and anti-theft alarm system in the library, which is located at the main entrance and exit, lobby, library, electronic reading, elevator car and other places on the first floor60monitoring points, total in the periphery3monitoring points. to ensure the safety of the building.
4, access control system
Access control is installed at the main entrance and exit of the building and the office area door; an access control fast track is installed at the main entrance on the first floor and is compatible with the campus card.
5, Building automation system
The Library and Information Center uses the building automatic control system to automatically control professional facilities such as heating, ventilation, air conditioning, water supply and drainage, power supply and distribution, lighting, elevators, and security. Automatically adjust various equipment according to external conditions, environmental factors, and load changes to always run in the best state; automatically realize the regulation and management of electricity, heating, water supply and other energy sources.
6, Integrated wiring system
Integrated wiring system is installed in the library and information center, and there are total integrated wiring in the building1528points, where8Floor settings84"vertical sockets" replaced8In the reading and office area on the first floor300Multiple information point ground plugs and strong power ground plugs; reserved in the building40Wireless pointsYuTeacher and classmates are surfing the Internet wirelessly in the building.
7, large screen display, background music and public address system
Electronic display screens are installed at the main entrance of the Library Information Center, entrances on each floor, and the lecture hall with 1,000 people to release information and notices to students, office staff, and participants in a timely manner; the public address system can play background music and release daily management information, and can perform evacuation broadcasts, emergency escape broadcasts, etc. in emergencies.
8, multimedia projection and sound reinforcement system
A multimedia projection and sound reinforcement system is installed in the conference hall. The system consists of central control equipment, projectors, projection screens, etc. to facilitate projection during meetings.
9、Cable TV System
The Library and Information Center is equipped with a television system, which is integrated into the cable TV network system of the w88 casino. User terminals are located in various offices, management rooms and other places.
It should be noted that due to vehicle restrictions during the Olympic Games, the supply and installation of some equipment have been affected to a certain extent, so the installation of the network system will take a few days and will be postponed for a few days. The Infrastructure Department will continue to work with the construction unit on maintenance and repairs during the use of the building to provide teachers and students with a convenient, fast and comfortable learning space.